Metropolitan Transportation Authority New York City Transit brings FASTRACK back to the Upper East Side of Manhattan on the 4, 5 and 6 Subway Lines, this time to perform maintenance work in the lower level express tunnels.
CTC, Inc., shipped 52 "Do Not Stop on Tracks" signs that use LED technology to Colorado for installation at 26 grade crossings.
Kal Krishnan Consulting Services, Inc. (KKCS), appointed Gary Gordon, PE, as associate vice president, based in the Northeast.
The Chicago Transit Authority (CTA) kicked off of the $425-million Red Line South Reconstruction Project May 19.
The New York Metropolitan Transportation Authority's Long Island Rail Road (LIRR) began a $40 million construction project to modernize the LIRR's Massapequa Station on May 17.
