Cleveland RTA Board to meet May 18

Written by jrood

The Board of Trustees of the Greater Cleveland Regional Transit Authority meets at 9 a.m. on May 18, at RTA's main office.

The Board will consider
10 resolutions, including:

Authorizing a $150,000 contract with Standard Contracting
and Engineering Inc.
of
Brook Park to install upgraded ADA ramps and sidewalks at the Flats-East Bank
Rapid Station on the Waterfront Line, the West 98-Cudell Rapid Station on the
Red Line, the Parma Transit Center, the North Coast Rapid Station eastbound
platform on the Waterfront Line, the West Third Street Rapid Station eastbound
platform on the Waterfront Line, and the Euclid Park-N-Ride lot. The bid is 49
percent lower than the engineer’s estimate.

Ratifying the general manager’s award of a contract,
up to $180,000, with
Standard Contracting & Engineering Inc. of Brook Park to demolish pre-cast walls at the
light-rail Warrensville Center and Woodhill Rapid Stations. The Warrensville
Station is on the Green Line, the Woodhill Station is on the common track
section west of Shaker Square.

Tags: