OFF Track Maintenance

The Sound Transit Board has outlined proposed changes to the Sound Transit 3 Draft Plan, with emphasis on completing light-rail extensions sooner.
The Southeastern Pennsylvania Transportation Authority (SEPTA) Board has approved Operating and Capital Budgets for Fiscal Year 2017, which is the 12-month period beginning July 1, 2016.
Drivers can see trains approaching but cannot accurately judge their speed when proceeding through a railroad crossing, a Queensland University of Technology (QUT) and Australasian Centre for Rail Innovation collaborative…
Protran Technology has secured its first key order from a major U.S. Class 1 railroad for its COMPASS™ railway asset location and awareness system.
The Metropolitan Transportation Authority (MTA) has awarded $7.5 million in contracts for preliminary engineering work at two stations at Willets Point, Queens.
Metropolitan Transportation Authority (MTA) can proceed with its largest infrastructure investment in its history following a key approval of its five-year capital program.
Following the successful launch of Positive Train Control (PTC) on the Warminster Line in mid April, Southeastern Pennsylvania Transportation Authority (SEPTA) continued its strategic rollout of the technology with installation…
The Kanawha River Railroad (KNWA), a subsidiary of Watco Transportation Services, LLC (WTS) has reached a definitive agreement with Norfolk Southern to lease and increase operations on 309 miles of…
A planned double track project in Indiana may move forward following a key approval from the Federal Transit Administration (FTA).
Frank DePaola, who has served as general manager of the Massachusetts Bay Transportation Authority (MBTA) since February 2015, plans to retire after his current appointment expires on June 30.
Page 17 of 300