ON Track Maintenance

Amtrak has chosen Hill International and CH2M to provide program management support services for its Gateway Program in the Northeast Corridor.
The Alameda Corridor-East (ACE) Construction Authority broke ground on its 16th grade separation project Sept. 16.
Infrastructure Ontario (IO) and Metrolinx are moving forward with the procurement process to build four GO rail stations and a rail tunnel to support Go Regional Express Rail (RER).
Six Wisconsin freight rail projects were awarded $37 million in grants and loans from the state's Freight Railroad Assistance Program.
Safety at crossings, stations and tracks in 14 states and the District of Columbia will be enhanced thanks to $25 million in grants awarded by the Federal Railroad Administration (FRA).
The Massachusetts Bay Transportation Authority (MBTA) had extra help kicking off its second phase of winter resiliency work during the weekend of Sept. 10-11.
The Massachusetts Bay Transportation Authority (MBTA) will progress work on the second phase of a bridge replacement project this fall.
The Connecticut Department of Transportation's (ConnDOT) preferred alternative to replace the Walk Bridge in Norwalk, Conn., is a Long Span Vertical Lift bridge.
The Washington State Department of Transportation (WSDOT) has reopened the application period for $5 million in loans for freight rail projects.
BNSF has completed double tracking a three-mile segment that crosses the Pecos River near Fort Sumner, N.M.
16
Page 16 of 125

Get the latest rail news

The inside scoop from RT&S, IRJ and Railway Age on and off the track. Join our email list.