ON Track Maintenance

Six Wisconsin freight rail projects were awarded $37 million in grants and loans from the state's Freight Railroad Assistance Program.
Safety at crossings, stations and tracks in 14 states and the District of Columbia will be enhanced thanks to $25 million in grants awarded by the Federal Railroad Administration (FRA).
The Massachusetts Bay Transportation Authority (MBTA) had extra help kicking off its second phase of winter resiliency work during the weekend of Sept. 10-11.
The Massachusetts Bay Transportation Authority (MBTA) will progress work on the second phase of a bridge replacement project this fall.
The Connecticut Department of Transportation's (ConnDOT) preferred alternative to replace the Walk Bridge in Norwalk, Conn., is a Long Span Vertical Lift bridge.
The Washington State Department of Transportation (WSDOT) has reopened the application period for $5 million in loans for freight rail projects.
BNSF has completed double tracking a three-mile segment that crosses the Pecos River near Fort Sumner, N.M.
TriMet resumed regular service along MAX light-rail lines Sept. 4 in Portland, Ore., following improvements that were made during the past two weeks.
The Santa Clara Valley Transportation Authority (SCVTA) has announced that system testing is underway on along its 10-mile BART Berryessa Extension, and it will soon begin the electrification of the…
Rideau Transit Maintenance General Partnership (RTM) has chosen Alstom to maintain the O-Train Confederation Line, the Canadian capital’s light-rail transit system.
2
Page 2 of 110