ON Track Maintenance

The Transbay Tube has reopened following a labor-intensive weekend for Bay Area Rapid Transit's (BART) Track, Structures, Power, Train Control, Traction Power Engineering and Train Control Engineering teams.
Work to install new tracks and infrastructure have been completed on the express tracks of New York City Transit (NYCT) Queens Boulevard Line and the local tracks of the Lexington…
Infrastructure Ontario and Metrolinx have issued a request for qualifications (RFQ) for interested parties to design, build, finance and maintain the Finch West Light Rail Transit project.
Metrolinx installed and modernized its track throughout the Weston GO Station in York, ON, Canada, as part of the Georgetown South Project (GTS).
Twin Eagle Sand Logistics, LLC, a subsidiary of Twin Eagle Resource Management, LLC, has broken ground on the Permian Rail Park located on the Union Pacific, approximately eight miles west…
Port Authority Transit Corporation (PATCO) will begin the final stages of its 18-month effort to completely rehabilitate the Ben Franklin Bridge.
Workers began installing the first sections of rail on the $388-million Long Island Rail Road (LIRR) Double Track Project, which will build a second track over an 18-mile stretch between…
The University of Illinois at Urbana-Champaign (UIUC) hosted a ribbon cutting ceremony for its Research and Innovation Laboratory (RAIL) located at the Harry Schnabel, Jr., Lab.
Southeastern Pennsylvania Transportation Authority's (SEPTA) will finalize separation of its West Trenton Regional Rail Line from a CSX freight line.
The Mississippi Transportation Commission (MTC) has given its approval for the Mississippi Department of Transportation (MDOT) to award $1.44 million in grants to several railroads across the state for maintenance…
29
Page 29 of 118

Get the latest rail news

Global news and analysis from RT&S, IRJ and Railway Age by email