| UTA hires HDR to Provide services for Sugar House Streetcar Project |
|
|
|
| Wednesday, September 14, 2011 | |
|
The Utah Transit Authority hired HDR to provide preliminary engineering, with the option to provide final design and design services during construction, for the Sugar House Streetcar project in Salt Lake City and South Salt Lake City, Utah. The proposed two-mile streetcar line is jointly owned by the Utah Transit Authority, South Salt Lake and Salt Lake City. Project goals include designing and developing a transit corridor with an emphasis on economic potential, livability and walkability.
As part of the new contract, HDR will provide preliminary engineering and final design services for the track work, structures, drainage, utility relocations, stations, street reconstruction and at-grade crossings. |
Sign up for Rail Brief & Rail Group News
| Keep up with the latest rail news with our email newsletters |



