Construction of a new six-level, 1,200-parking-space structure on the west side of the D.C. Metro’s Glenmont Metrorail station is set to begin January 3, resulting in the need to close the west Kiss & Ride parking lot at closing on that day, to accommodate the construction. Customers who normally use the west Kiss & Ride parking lot can use the east Kiss & Ride parking lot on the east side of the Glenmont Metrorail station near the existing parking facility.
Construction of the $24.7-million parking structure is expected to continue for at least one year, with the new garage slated to open in early 2012. It will increase the parking capacity at the Glenmont Metrorail station to nearly 3,000 spaces. The parking structure on the east side has a capacity of 1,781 parking spaces.
Canadian National Railway won’t make permanent repairs on two bumpy crossings until next year, an Outagamie County, Wis., official says, the Appleton Post-Crescent reports. In an e-mail message this past week, CN let the county know it ran out of time to fix the crossings, said Ray Palonen, deputy highway commissioner.
The county’s demand for a fix on three troublesome crossings goes back to March. Only one of the three was repaired.
Here’s a county snapshot of the two crossings in need of repairs:
o No repairs have been made on the County J crossing south of County OO in the town of Kaukauna. The crossing is still rough and frost likely will raise the pavement along the timbers.
o No repairs have been made on the west track on County BB east of Bluemound Drive in Grand Chute. There are potholes and pavement deterioration along timbers, and timbers are in need of replacement.
"We’ll just have to try to buffer those joints as best we can with some temporary materials until they get them repaired," Palonen said. He said a railroad spokesman indicated CN fully intended to make repairs but "ran out of time."
Jackie Macewicz, CN’s manager of public works based in Stevens Point, did not return a telephone call seeking comment.
Thomas Running, a representative with the state Office of the Commissioner of Railroads, said it meets regularly with railroads.
"One of our top priorities at these meetings is making sure the railroad is on top of crossing repairs," he said. "Statutorily, railroads are not required to repair crossings through the winter months."
A third Outagamie County crossing, on County S east of County A in Center, was adequately repaired with the re-fastening of timbers, the county said.
Palonen said frost gets beneath the pavement and plays havoc with the driving surface.
"Last winter when you crossed the County J crossing, you had to
drive really slow. We had ‘bump’ signs up all winter," he said. "We had to put cold mix in there."
No one was thrown out of control due to the problem, but the county received a raft of complaints from motorists who use the route, he said. Palonen said County J, accessible off U.S. 41, is a frequently used route by truck traffic serving paper mills in the Heart of the Valley.
U.S. Transportation
Secretary Ray LaHood said that a final agreement has been signed for a $33.8-million
Recovery Act-funded project that will upgrade a train crossing and eliminate
delays in the San Bernardino, Calif., area. As a result, work can now begin on
the project, which will elevate two Union Pacific tracks over two BNSF main line
tracks in Colton.
U.S. Transportation Secretary Ray
LaHood and Federal Transit Administrator Peter Rogoff said that Utah would
receive $37 million in advanced payments for two rail projects funded under its
New Starts grants program.
Due to an unexpected change
in Congressional scheduling, Railroad Day Organizers must reschedule the 2011
Railroad Day on Capitol Hill. The event will now take place Thursday, July 14,
2011.
Caltrain, the 55-mile
commuter railroad serving the San Francisco Peninsula, has an ongoing
commitment to safety. The agency uses a multifaceted approach, addressing
safety issues on three fronts: engineering, education and enforcement.
Engineering improvements
include upgrades to crossings, such as pedestrian gates, and grade separation
projects that separate vehicle and pedestrian crossings from the train tracks.
This year marked the start
of construction on the San Bruno Grade Separation Project. The $147-million
project will elevate the Caltrain tracks above three existing at-grade street
crossings at San Bruno, San Mateo and Angus avenues. A new elevated Caltrain
station will be constructed between San Bruno and San Mateo avenues, replacing
the existing station at Sylvan Avenue. And pedestrian underpasses will be built
at Euclid, San Bruno and Sylvan avenues.
At the Santa Clara station,
a $40-million modernization project will add a new wider, longer
center-boarding platform to the station. A new pedestrian underpass will allow
passengers to move safely from one side of the platform to the other.
A $5.8-million project will
improve safety for motorists and pedestrians at eight crossings in Santa Clara
County. The improvements include signalized pedestrian gates, crossing panels
and, where appropriate, center medians to keep vehicles from driving around lowered
crossing gates.
In September, as part of
Railroad Safety Month, the agency installed the first of 250 suicide prevention
signs with a hotline number to a local crisis intervention agency. The signs
are part of national study to test the effectiveness of signs in preventing
suicides on railroads.
The signs will be posted
along a 10-mile stretch of the right-of-way between Menlo Park and Mountain
View. The hotline number on the new signs is routed directly to the Youth and
Family Services Crisis Intervention Center in San Carlos. The calls will be
tracked to determine if the signs are an effective tool for suicide prevention.
Caltrain is a member of
Operation Lifesaver, an internationally renowned organization promoting rail
safety. First organized 38 years ago, the organization has helped reduce the
number of train/vehicle collisions from a 1972 high of roughly 12,000 annual
incidents to a 2009 record low of approximately 1,900 incidents. This past
year, Caltrain has given Operation Lifesaver presentations to more than 1,300
people. Audiences have included students, community groups, police and fire
officials, elected officials and civic leaders. The presentation can be
targeted to specific audiences and includes videos and handouts.
Caltrain’s Transit Police
represent the enforcement component of Caltrain’s rail safety program. The
Transit Police Bureau, comprised of San Mateo County Sheriff’s officers, is
responsible for policing Caltrain property, including stations, parking lots
and railroad right of way. These highly-skilled law enforcement professionals
are familiar with railroad operations and the conditions at rail grade
crossings. Whenever a vehicle or pedestrian collision occurs along Caltrain’s
rail line, the Transit Police respond.
The Transit Police target
locations where people may engage in unsafe behavior, such as trespassing along
the rail line and walking around lowered gates at stations or grade crossings.
As of October, Transit Police had issued 560 citations.
Transit Police deputies
also receive specialized Crisis Intervention Training. This training helps
deputies recognize people who may be a threat to themselves or others in the
vicinity of Caltrain’s railroad. As a result, the Transit Police referred 17
people to treatment programs this year.
Caltrain is committed to
its role as a safety advocate and will continue to communicate safety messages
with the goal of increasing public awareness and ending tragic collisions,
fatalities and injuries at grade crossings and on the right of way.
Fort Worth & Western
Railroad said that Steven George would retire in the first quarter of 2011 as
president and chief executive officer of the Fort Worth-based 276-mile regional
railroad. Succeeding him will be Thomas Schlosser, former chief executive
officer of Global Rail Systems, Inc., Marlin, Texas, and chairman of the
American Short Line & Regional Railroad Association from 2007 to 2010.
The rough railroad
crossings throughout the town of Fairfield, Maine, are a source of constant
complaints to local officials, the Waterville Morning Sentinel reports. But
because the railroad is privately owned, the town can’t repair the crossings.
The latest solution is to let aggravated drivers know who can fix them.
Koppers Inc., a
wholly-owned subsidiary of Koppers Holdings Inc., said that it has completed a
transaction to acquire the rail joint business product line and related
manufacturing facility of Portec Rail Products, Inc. for a purchase price of
$10.1 million less certain assumed liabilities, subject to certain working
capital and other adjustments. The purchase price was funded with cash on hand.
Illinois
Transportation Secretary Gary Hannig said that a historic public-private
partnership agreement on high-speed rail development is in place to bring
Illinois one giant step closer to achieving high-speed passenger service
between Chicago and St. Louis by 2014.
L. B. Foster Company announced
the expiration of the subsequent offering period offered by its wholly-owned
subsidiary, Foster Thomas Company, for its cash tender offer for all outstanding
shares of common stock of Portec Rail Products, Inc. The subsequent
offering period expired at 5:00 p.m., New York City time, on December 21, 2010.
MTA NYC Transit reopened
the Rockaway Park-bound platforms at the Beach 105th Street-Seaside and Beach 90th
Street-Holland stations. The rehabilitation of
these stations is part of a $117-million project encompassing nine stations on
the Rockaway Peninsula.
Tracks between San Juan
Capistrano and Oceanside, Calif., remain closed due to mudslides. Trains are
only operating as far south as Laguna Niguel. Metrolink is continuing
to provide bus transportation between Oceanside and Laguna Niguel.
With a new majority in
the House, a new chairman and many new members of the House Transportation and
Infrastructure Committee, as well as a changing national economic picture, it
is worth asking the question, "What’s ahead for transportation in
2011?" The American Association
of State Highway and Transportation Officials (AASHTO) has compiled a list of very distinct – and pressing
– issues that loom at the local, state, and federal levels.
L.B. Foster Company has begun delivering 28,500 tons
of 115-pound standard continuous welded rail to New England Central Railroad
(NECR), an operating subsidiary of RailAmerica, Inc., for upgrading
approximately 140 miles of track. L.B. Foster’s specially-equipped cwr
trains will complete 18 shipments of welded rail by mid-2011 for installation
at various locations throughout Vermont.
The Association of American
Railroads released the 2010 Edition of Railroad Facts – the premier industry statistical reference book.
The publication notes that in 2009, rail traffic experienced the largest
percentage decrease since 1949 with carloads down 15.1 percent and ton-miles
down 13.8 percent, but that aggressive cost management by railroads helped to
bolster year-end performance and allowed for record capital investment totaling
$9.9 billion.
The Burlington BNSF bridge is a swing span no more, the Burlington Hawk Eye reports. Ending 119 years as a less-than-150-foot navigation channel, the new lift span that was floated in December 20 will more than double the navigation channel when it reopens to barge traffic in the spring.
Crews with Ames Construction, based in Minnesota, worked over 30 hours, which started at about 6 a.m., December 20, to float out the temporary spans put in last month and float in the new lift span. The temporary spans will be relocated to make room for the new lift span.
During the 30-hour window of switching out of the spans, the bridge will be closed to train traffic. The navigation channel was closed last week to allow construction to continue on the bridge.
The bridge is expected to be operational by March, when river navigation reopens in the spring.
About 35 trains a day, including two Amtrak trains, use the Burlington bridge, and each month the bridge opens 300 times for river traffic.
"This is an important route for customers and passengers, and this new bridge will give us a more reliable and improved infrastructure that reflects that," Steve Millsap, an assistant vice president of BNSF, said previously in a release.
The remaining spans also will be replaced as a BNSF effort to replace the entire span gets under way in a separate phase of construction. BNSF also is replacing the approach spans on the bridge. Construction of those spans is expected to be complete by Walsh Construction by December 2011.
The lift-span project is funded primarily through the American Recovery and Reinvestment Act of 2009 and previous funds from Congress.
More subway customers than ever now benefit from knowing exactly when their train will arrive as countdown clocks have been activated in 100 stations along MTA New York City Transit’s numbered lines. This important milestone exceeds the MTA’s original goal to get 75 stations online by the end of the year. A similar project to activate informational signs continues to progress along the lettered lines as well.
Customers using Manhattan’s Houston Street Station on the No. 1 Line are the latest to receive up-to-the-minute next train information that takes the guesswork out of how long the wait time will be. The ambitious project to install Public Address/Customer Information Screens, more popularly referred to as Countdown Clocks, in the system’s stations is changing the habits of subway riders every day.
Now, instead of peering into the tunnel and guessing when the next train will arrive all they have to do is look up and they can see how many minutes until the next two trains reach the station. Originated on the L Canarsie Line in 2007, the system is in the process of being activated in 152 stations along the numbered lines in the Bronx, Manhattan and Brooklyn.
"For years, transit riders in other cities around the world have been looking at digital signs to know when the next bus or train is coming," said MTA CEO Jay H. Walder. "But in New York, we were left peering down a subway platform looking for headlights. We’re changing that and improving our customers’ experience one station at a time."
"This is all about providing information to our customers who may see similar systems in other locations and ask, ‘Why not here?’ Well, we asked ourselves the same thing and we are now moving briskly ahead with this project," said NYC Transit President Thomas Prendergast.
The PA/CIS system, which is being rolled out along the numbered lines, is a major component of the MTA’s effort to substantially upgrade customer communications across the entire network. Providing train-arrival messages both visually and by audio, allows customers to be kept fully informed of regular service, delays or emergency situations, should they arise.
L.B. Foster Company said that its wholly-owned subsidiary, Foster Thomas Company, has extended its cash tender offer for all outstanding shares of common stock of Portec Rail Products, Inc., until 5:00 p.m., New York City time, on December 22, 2010. The tender offer was previously set to expire at 5:00 p.m., New York City Time on December 21, 2010.
As of December 21, 2010, approximately 991,424 shares of common stock had been tendered in the subsequent offering period and Foster Thomas Company has accepted for payment all tendered shares. Foster Thomas Company now owns approximately 8,622,393 Portec Rail shares, representing approximately 89.78 percent of Portec Rail outstanding shares.