MBTA set to replace Commercial Street Bridge

The MBTA’s Capital Delivery Bridge & Structures team will replace the Commercial Street Bridge in Lynn, Mass. from Sept. 16-20.

STV leading construction management of Portal North Bridge replacement project

The replacement of a 112-year-old, swing-style rail bridge that spans the Hackensack River from Kearney to Seacaucus, N.J., known as the Portal North Bridge, is just one of a series of projects in Amtrak’s Gateway Program.

Record-breaking CRISI funding will help fuel ‘railroad revolution’

The U.S. DOT has issued a Notice of Funding Opportunity (NOFO) announcing the availability of over $1.4 billion in Consolidated Rail Infrastructure and Safety Improvement (CRISI) Grant funding.

MBTA has been responding to FTA’s safety concerns, but more work is on the horizon

The MBTA launched the Quality, Compliance, and Oversight Office to address the Federal Transit Administration’s (FTA) findings contained in the Safety Management Inspection report.

Contractor for San Jose tunnel now wants to implement a number of ‘innovations’

The prime contractor for a BART light rail extension project wants to do some unstacking.

BNSF’s John Cech named 2022 Engineer of the Year by Railway Track & Structures

John Cech, vice president, Engineering at BNSF, is the recipient of the 2022 Engineer of the Year Award from Railway Track & Structures Media.

Sectioned on: MTA opens another piece of LIRR Third Track project

The Metropolitan Transportation Authority (MTA) announced the opening of the 2.5-mile second section of the Long Island Rail Road’s new Main Line third track between the Merillon Avenue and Mineola stations.

Watch: Time lapse of drilled shaft installation on Red-Purple Line Modernization Project in Chicago

Walsh Construction and Fluor Corporation perform drilled shaft installation during a shutdown of Lawrence Avenue in Chicago, part of the Lawrence-to-Bryn Mawr portion of the Red-Purple Modernization.

Watch: Crews remove third segment of Merchants Bridge; final installation now complete

The $222 million project to replace the Merchants Bridge that links Missouri and Illinois near downtown St. Louis is nearing completion, and the St. Louis Regional Freightway gave invited guests and the public the opportunity to see one of the last significant milestones in the project firsthand from the special vantage point of a riverboat cruise.

Calgary awards ARM rail grinding contract

The city of Calgary has awarded Advanced Rail Management (Canada) Inc. a one-year contract, with four option years, for rail grinding services on the Calgary Transit CTrain light rail system.

Crews prepare to build light rail bridge on TriMet project

TriMet’s ongoing efforts to rejuvenate and improve the MAX system in the Portland, Ore., area will continue in September and require closures of I-84 and a small section of the MAX Blue Line.

Grade separation on California high-speed rail project now open

The California High-Speed Rail Authority (Authority), in collaboration with contractor Tutor-Perini/Zachry/Parsons, announced the Avenue 15½ Grade Separation in Madera County is now open to traffic.

Bells & Whistles—Maryland’s Purple Line project is making a comeback

The top news stories RT&S was following the week ending Aug. 26.

Report: More BART projects are active than ever before

There are now more rebuilding projects happening across the BART system than at any point in the District’s 50-year-history despite the continuing impacts of the global pandemic.

L.A. Metro line extension in the running to receive much needed funding for completion

There have been a lot of hands trying to reach for California’s $97 billion state surplus, and some will be slapped away.

Watch: Demolition of railroad bridge wounds nearby highway bridge

Friendly fire is never sent with the best intentions.

L.A. Metro Board could be ready to officially advance light rail project

The San Fernando Valley could be in for a pretty good haul as far as light rail projects go.

Record flooding in Mississippi leads to train derailment

Heavy rains that have been hitting the southern portion of the U.S. has now led to a train derailment east of Brandon, Miss.

Ready for a do over? Major construction activities will ramp up on Maryland’s Purple Line project

After dominating the headlines for a long period of time due to trouble, Maryland’s Purple Line light rail project is ready to change the landscape.

HART

Critical component of HART light rail project will soon be underway; called ‘huge accomplishment’

The Honolulu Authority for Rapid Transportation (HART) has announced the award of a contract for the relocation of utility infrastructure along Dillingham Boulevard to Nan, Inc.

LOAD MORE