OLI’s Bonnie Murphy to join DART in November

Bonnie Murphy will conclude her term as president of Operation Lifesaver, Inc. (OLI), on November 1; she has been with OLI since January 2016.

LIRR completes Post Ave. Bridge replacement early

The Long Island Rail Road (LIRR) completed the $9.7-million replacement of the Post Avenue Bridge in Westbury, N.Y., ahead of schedule, allowing traffic to return to normal on Oct. 23.

O.C. Bridges program wraps up with final two grade separations

A five-year, $663-million program to build seven bridges and underpasses to separate vehicle, pedestrian and freight rail traffic in Anaheim, Fullerton and Placentia, Calif., is now complete.

Bureau of Reclamation clears California HSR project for irrigation pipe relocations

The U.S. Department of the Interior Bureau of Reclamation has finalized an environmental analysis of a proposal to replace or relocate irrigation pipelines in the Central Valley to accommodate guideways for the Merced to Fresno section of California’s high-speed rail project.

Ontario establishes HSR advisory board for Toronto-Windsor link

Ontario is establishing a High-Speed Rail (HSR) Planning Advisory Board to provide strategic support and community engagement as the province pursues plans to build a high-speed connection between Toronto and Windsor.

MBTA Green Line Extension project receives cost guarantee from two teams

Two of the three teams shortlisted for the Massachusetts Bay Transportation Authority (MBTA) Green Line Extension (GLX) Project have said they can product the project at or under the $1.319-billion Affordability Limit.

Toronto Tunnel Partners selected for GO RER rail tunnel project

A consortium led by EllisDon Capital Inc. and STRABAG Inc. has been selected by Infrastructure Ontario (IO) and Metrolinx as the preferred proponent for the Highway 401 Rail Tunnel project.

PANYNJ invests $1B in recovery following Superstorm Sandy

Five years after Superstorm Sandy caused flooding and devastation to Port Authority of New York & New Jersey (PANYNJ) facilities, the agency announced that it has invested nearly $1 billion to date to recover, protect and rebuild in the storm’s aftermath.

TriMet’s McFarlane to retire in early 2018

TriMet General Manager Neil McFarlane will retire after more than seven years at the helm of Oregon’s largest public transit provider.

Work to begin on 25th Ave. grade separation project

Construction is set to begin on a grade separation project in San Mateo, Calif., that has been a long sought goal of the city and Caltrain.

New wheel profile helps BART with noise pollution

After just more than a year since it announced what it called “a design breakthrough,” Bay Area Rapid Transit (BART) has released the results of its new, reduced-contact wheel profile.

Metra leads 34th CREATE improvement project

Chicago Region Environmental and Transportation Efficiency (CREATE) Program began construction on Project B1, its 34th project aimed at improving safety and keeping Metra and freight trains moving through the region more efficiently.

Nashville mayor proposes $5.2B transportation plan

A new transportation proposal introduced by Nashville Mayor Megan Barry calls for long-term investment to improve the city’s transportation system and includes 26 miles of light rail.

LIRR readies for Post Avenue Bridge replacement

During the weekend of October 21-22, workers using cranes and a movable industrial-grade hydraulic lift will remove the Long Island Rail Road’s (LIRR) 103-year-old Post Avenue Bridge and roll a new pre-assembled one into place.

NYCT incorporating Subway Action Plan into FASTRACK maintenance

The Metropolitan Transportation Authority (MTA) began an extensive list of maintenance, cleaning and repair work that will be performed during the next two weeks, on the 1, 2 and 3 lines between 34 St-Penn Station and South Ferry/Atlantic Av-Barclays Ctr.

GO Transit Whitby facility to open December 2017

The new GO Transit Whitby Rail Maintenance Facility is nearing completion after more than two and a half years of construction.

FTA issues FONSI for NJ Transit’s Raritan River Bridge replacement project

The Federal Transit Administration (FTA) issued a Finding of No Significant Impact (FONSI) on Oct. 13 for New Jersey Transit’s Raritan River Bridge Replacement project.

NVTA’s $43 billion build-out strategy

WMATA Metrorail extensions, capacity and service enhancements for Virginia Railway Express (VRE) and new light rail transit (LRT) are among the numerous projects proposed by the Northern Virginia Transportation Authority (NVTA) in a TransAction Plan Update adopted Oct. 12.

Portal Bridge replacement project officially begins

A ground breaking ceremony was held Oct. 31 for the replacement of the Portal Bridge, a two-track 110-year-old swing span structure linking New Jersey and New York City.

DEIS released for SEPTA King of Prussia extension

The Federal Transit Administration (FTA) has released the Draft Environmental Impact Statement review (Draft EIS) for Southeastern Pennsylvania Transportation Authority’s (SEPTA) King of Prussia Rail Project (KOP Rail). 

LOAD MORE