SEPTA readies for fourth annual Trolley Tunnel Blitz

Southeastern Pennsylvania Transportation Authority (SEPTA) will perform power, track and station improvements during its Trolley Tunnel Blitz July 8 through July 10, temporarily suspending trolley routes 10, 11, 13, 34 and 36.

MassDOT approves five-year, 14.8B capital investment plan

The Massachusetts Department of Transportation (MassDOT) Board approved a $14.8 billion five-year capital investment plan that includes a $3.8 billion state of good repair backlog reduction for transit in the commonwealth.

Union Pacific plans $25.8M investment in Washington state, New Mexico

Union Pacific plans to invest $25.8 million in 2016 to improve its transportation infrastructures in Washington state and New Mexico, which will enhance employee, community and customer safety and increase rail operating efficiency.

GREX names Euston VP of engineering

Georgetown Rail Equipment Company (GREX) promoted its director of inspection technology, Todd Euston, to the position of vice president of engineering.

Union Pacific to invest $44.3M into Wyoming, Utah infrastructure

Union Pacific plans to invest $44.3 million to improve its infrastructure in Wyoming and Utah this year. The company says its multi-million dollar private investments will enhance employee, community and customer safety and increase rail operating efficiency.

WMATA’s first SafeTrack Surge ahead of schedule in many categories

Planned work for the first Washington Metropolitan Area Transit Authority (WMATA) SafeTrack “surge” between Ballston and East Falls Church is at 96 percent complete.

Optimizing friction management

Suppliers are investing in the development of new products that maximize uptime while reducing total cost of ownership.

State, federal inspectors looking at Columbia River Gorge tracks

Inspectors from state and federal agencies in Oregon and Washington state are conducting track inspections along the Columbia River Gorge rail line this week between Vancouver and Pasco, Wash.

2016 annual grade crossing report

Whether they are made of concrete, wood, composite or rubber, grade-crossing surfaces are made to provide a smooth, safe surface for railroads and vehicles to traverse across.

Vermont approves $33.4 million for rail projects

Vermont Gov. Peter Shumlin on June 2, 2016, signed the FY 2017 Transportation Bill, which approves approximately $612.6 million in infrastructure improvements, including $33.4 million for rail. The bill includes an overhaul of the trespassing regulations to improve safety on Vermont’s rail lines.

WSDOT opens availability for loans, grants for freight rail improvement projects

Applications are now being accepted for Washington state-funded grants and loans for projects that improve freight rail services. Funds will be available in July 2017.

New York grants to rehab three bridges; 52 miles of track

New York state has awarded $16.3 million in grants through the Passenger and Freight Rail Assistance Program to projects that Gov. Andrew Cuomo said will strengthen infrastructure, as well as support economic development by leveraging an additional $12.8 million in additional public and private investments.

Across the US communities seek $9.3 billion in TIGER funding

The Transportation Investment Generating Economic Recovery (TIGER) grant program has received 585 applications from across the country totaling $9.3 billion in requested funding – over 18 times more than the $500 million that will be awarded.

President of LTK Engineering Services retires, replacement appointed

LTK Engineering Services has promoted Dominic DiBrito to president, replacing George Dorshimer, who will be retiring, effective January 1, 2017.

Union Pacific Nevada program includes rail, tie replacements

Union Pacific plans to spend $33.7 million on improvements to its Nevada infrastructure in 2016. This year’s investment is on top of the $180 million UP spent in the state from 2011-2015.

Trackwork complete for Toronto-York Spadina extension

Premier Kathleen Wynne visited the site of the future Vaughan Metropolitan Centre Station at Highway 7 in York Region on June 6 to mark the completion of track work on the Toronto-York Spadina Subway Extension (TYSSE).

Rep. Fitzpatrick joins TRAC Lubricants and Coatings and the New Hope and Ivyland Railroad for demonstration, discussion

On June 6, 2016, Rep. Michael Fitzpatrick (R-PA-8) joined representatives from TRAC Lubricants and Coatings (TLC) and the New Hope and Ivyland Railroad for a product demonstration and rail industry discussion.

Two design-build contracts awarded for LIRR Double Track project

The Long Island Rail Road (LIRR) Ronkonkoma Branch Double Track project is one step closer to breaking ground after two design-build contracts were awarded for work that will significantly advance the project.

Purple Line Extension station construction set to begin on LACMTA

Los Angeles County Metropolitan Transportation Authority (LACMTA) will begin building the Wilshire/La Brea underground station for the Purple Line Extension Project June 10.

Sound Transit approves faster ST3 light-rail extensions

The Sound Transit Board unanimously approved changes to the Sound Transit 3 plan that will speed up Sound Transit 3 light-rail extensions by two to five years and add projects in Renton, Kirkland and North Seattle.

LOAD MORE