MDOT: $19MM in 2023 M-REP Grants
The Michigan Department of Transportation (MDOT) has awarded the first round of funding in its 2023 Michigan Rail Enhancement Grant Program (M-REP). Twelve projects were selected to receive $19 million for “strategic
The Michigan Department of Transportation (MDOT) has awarded the first round of funding in its 2023 Michigan Rail Enhancement Grant Program (M-REP). Twelve projects were selected to receive $19 million for “strategic
SAN CARLOS, Calif. – Caltrain’s Board of Directors on June 2 approved its Fiscal Year 2024 (FY24) and Fiscal Year 2025 (FY25) operating and capital budgets at the rail agency’s monthly board meeting.
JACKSONVILLE – At first glance, CSX’s autonomous track assessment cars (ATACs) look much like a regular boxcars. In reality, however, ATACs carry advanced sensing and communications technology to detect track defects and send information automatically to the company’s Engineering database.
RICHMOND, BC – TransLink announces construction between Bridgeport Station and Richmond-Brighouse Station on the Canada Line.
SAN CLEMENTE, Calif. – The rail line through San Clemente was set to reopen for passenger rail service on Saturday, May 27, as emergency work has stabilized a hillside north of the Pier that last month scattered debris into the rail right of way below.
VTA’s BART Silicon Valley Phase ii Extension Project has its’ first CTMP from Tunnel and Trackwork Coordinator Kiewit, Shea, and Traylor and the BSVII Project Team.
TriMet on May 24 announced that between June 18 and Oct. 21, MAX Red Line stations between Gateway Transit Center and Portland International Airport will be closed, allowing crews to access TriMet right-of-way and perform major construction for its “A Better Red” MAX Extension and Reliability Improvements Project.
The Gateway Development Commission (GDC) on May 22 named a shortlist of qualified teams who will receive an invitation to submit a proposal in response to a Request for Proposals (RFP) to
TiEnergy has marked its 20th year as a family-owned railroad tie removal and recycling company. Based in Hampshire, Ill., TiEnergy, a division of Midwest Companies, works with Class I, II and III
The Connecticut Department of Transportation (CTDOT) is starting construction on the Norwalk River Railroad (Walk) Bridge Replacement Project in Norwalk. Originally built in 1896, the Walk Bridge is a four-track swing span
The North Carolina Department of Transportation has awarded five Class II railroads in the state $2.1 million in matching grant funds through the Freight Rail & Rail Crossing Safety Improvement (FRRCSI) Program
The Ohio Rail Development Commission (Rail Commission) on May 11 approved a grant of up to $750,000 to Columbus & Ohio River Rail Road (CUOH), a Genesee & Wyoming, Inc. Company, to improve capacity at the Class II’s Newark Yard and mitigate the possibility of blocked railroad crossings in Zanesville, Ohio.
The California High-Speed Rail Authority (CHSRA) on May 11 issued a video update (below) on spring 2023 construction. It highlights the high-speed rail project’s progress, including completion of several structures throughout the
Progress is well under way on structural upgrades to BNSF’s 119-year-old Bridge 3.9A over Lake Pend Oreille outside Sandpoint, Idaho. The completion in November 2022 of the adjacent 4,873-foot long Bridge 3.9B allowed BNSF to
The Gateway Development Commission (GDC) on May 5 reported “significant progress and early work beginning in 2023” on the Hudson Tunnel Project, the largest component of the Gateway Program. The GDC Board
Amtrak, which has begun early construction activities as part of its $6 billion B&P Tunnel Replacement Program, on May 5 released a series of project renderings. The first project kicked off in
The Federal Railroad Administration is seeking information on “potential uses and options for disposal or repurposing of used creosote-treated railroad ties (CTRTs).” (Presumably not for landscaping, though Home Depot actually sells them
The latest information from the GTHA (Greater Toronto-Hamilton Area) shows progress on the Ontario Line and TTC Yonge North extension, but troubles for the Kitchener-Waterloo extension and Eglinton Crosstown LRTs Ontario Line
The North Dakota Department of Water Resources has issued two state permits to BNSF Railway, which are the final regulatory approvals required to replace the Bismarck-Mandan Rail Bridge over the Missouri River between the two cities.
Starting this summer, we’ll be launching new light rail service at least once a year, for the next several years. Here’s the latest on construction progress and opening timelines.