TransLink Construction on Capstan Station
RICHMOND, BC – TransLink announces construction between Bridgeport Station and Richmond-Brighouse Station on the Canada Line.
RICHMOND, BC – TransLink announces construction between Bridgeport Station and Richmond-Brighouse Station on the Canada Line.
Undercutting is a process that removes ballast from beneath an in-situ railroad track. Undercutters can typically extract between six and twenty-four inches of material in a pass.
WASHINGTON –Beginning Saturday, June 3, Metro will begin rail replacement work on the Orange Line in Virginia.
WASHINGTON –The Federal Transit Administration requires the MBTA to submit a new safety work plan that addresses their concerns more quickly than MBTA’s original deadline.
In an MTA Press Release, it has announced a contract with Laser Precision Solutions for the use of laser-equipped trains to reduce fallen leaves on railway tracks.
MTA announced the completion of renovations at the Far Rockaway-Mott AV subway station in Queens.
Ohio Senator Sherrod Brown, drafted several letters to each of the Class I CEOs who have rail lines in Ohio following reports sent to his office of eroding rail bridges.
RT&S has filed several reports over the past year about the very challenging situation with erosion, rock and mud slides on the southern California coastal rail corridor. Railroads, state and local agencies and others have been dealing with this for months, and it seems when remedial action is completed in one area, another area of trouble crops up.
BOSTON – MBTA has its work cut out for it.
The government of Canada and TransLink are each contributing C$17.498 million to replace approximately 12.6 miles (20.2 kilometers) of running rail and some 24,000 rail pads for SkyTrain’s Expo Line in metro Vancouver.
The New York Metropolitan Transportation Authority/Partnership for NYC Transit Tech Lab on May 9 reported the results of its Operational Efficiency and Human Capital Utilization challenges, in which 15 companies have been selected to collaborate with regional transit agencies and test technologies, such as AI (artificial intelligence), LiDAR and edge computing, to “mitigate service disruptions, automate operations and combat workforce shortages.”
R.J. Corman Railroad Services, LLC, a subsidiary of R.J. Corman Railroad Group, LLC, has announced the establishment of a new Emergency Response Division in Waterville, Maine, which as of May 1, will provide support to customers in the Northeast region of the U.S., including Maine and surrounding states, the company reported on May 4.
Metra on May 2 detailed its construction projects for 2023, which include station improvements valued at $119.5 million, or nearly a quarter of the Chicagoland commuter railroad’s annual capital spending for the year; platform repairs and replacements; and track and signaling system renewals.
Metrolinx has made progress on its guideway, the two terminus stations, and the maintenance and storage facility as the spring season gets underway.
The Metropolitan Transportation Authority announced on April 17 that crews have completed renovation work at the Grand St BD subway station in Chinatown under New York City Transit’s Re-NEW-vation campaign, which entailed rebuilding station components during a 55-hour window.
Metra crews on April 21 will begin work on a major rehabilitation project at the Rock Island Line’s 103rd Street/Washington Heights Station. The station will remain open for passenger service throughout the project, but the depot building will be inaccessible to commuters while construction is underway.
NRC and REMSA member Herzog Technologies, Inc. welcomed U.S. House of Representatives Member Troy Nehls (TX-22) for a tour of its Fort Worth, Texas, facility on April 7, 2023.
Sterling Infrastructure, Inc. has named Noelle Dilts to the position of vice president of Investor Relations and Corporate Strategy. Dilts will be responsible for leading Investor Relations and determining areas of strategic focus to grow existing and new segments in this role.
Harsco Corporation has named Jeffrey Beswick as senior vice president and president, Clean Earth, effective May 1, 2023. He will join the Company’s Executive Leadership team.
The Chicago Transit Authority has announced that 29 rail stations will be repaired and upgraded in 2023 as part of its ongoing station improvement program Refresh & Renew, a key initiative of the agency’s “Meeting the Moment” Action Plan.