WMATA Plans Summer 2023 Reliability Upgrades, Service Outages
The Washington Metropolitan Area Transit Authority announced on Jan. 24 that the focus of project work this summer will be system maintenance and modernization.
The Washington Metropolitan Area Transit Authority announced on Jan. 24 that the focus of project work this summer will be system maintenance and modernization.
Last year, Norfolk Southern’s Engineering team completed a variety of enhancement projects aimed at increasing service reliability, productivity, and volume growth while connecting customers to the U.S. and global economies.
The Metropolitan Atlanta Rapid Transit Authority will be suspending rail service south of the Atlanta-area agency’s Medical Center Station in order to carry out track replacement work from Feb. 17 at 9 p.m. through the end of service Feb. 22.
Now that the heavy rains have subsided, the Orange County Transportation Authority has been successful in stopping slope movement and stabilizing the tracks in South San Clemente, clearing the way for weekend service to resume.
Altamont Corridor Express trains resumed normal operating service Jan. 22 after mudslides the previous week left more than 200 passengers stalled on the tracks and disrupted rides two days in a row.
The California storms that that knocked out a section of train bridge in early January over the Sespe Creek may cost $1.5 million to replace, according to a local news report.
For more than two decades, Jerry Rhea and his crew of California-based Union Pacific railway workers have called the Roseville Rail Yard home.
The Metropolitan Transportation Authority has announced that the agency will complete switch replacement and Communications-Based Train Control related work along the A, C, and E8 Avenue line during Presidents’ Day weekend.
Bay Area Rapid Transit commemorated the completion of a multi-year upgrade project at Oakland’s 19th Street Station with a ribbon cutting on Jan. 21.
The Gateway Development Commission says at least 80 companies plan to attend an informational meeting related to its Request for Qualifications about the planned $16.1-billion Hudson River tunnel project, according to a report by ENR.
A new study from New York University’s Grossman School of Medicine has found that subway stations near river tunnels can have much greater quantities of potentially harmful particles, a phenomenon known as the “river-tunnel effect.”
Last month, onlookers witnessed the roughly 1,000-foot relocation of a two-story building that was previously part of a CSX train depot to the intersection of Maple Avenue and Martin Luther King Jr. Boulevard in Hamilton, Ohio.
A new project study has found that the Maryland Department of Transportation’s Purple Line—currently 4.5 years behind schedule—faces a further seven-month delay that could set back the opening of the light-rail line until mid-2027.
Metrolinx crews are continuing work on the Hazel McCallion Line in Brampton and Mississauga along Hurontario Street, the transit agency announced this week.
The Orange County Transportation Authority’s San Clemente slope stabilization project is facing further delays to restore its service between San Diego and Orange counties following several days of heavy rain.
While this is a local story, and the KC Streetcar is a comparatively small operation, it’s nice to report some encouraging news about growth in ridership and the increasing vibrance of a downtown area.
The Georgia Department of Transportation (GDOT) in January wrapped up its first Consolidated Rail Infrastructure and Safety Improvements (CRISI) Program grant project, which included upgrades along 138 miles of the 219-mile Heart of Georgia (HOG) Railroad.
The Public Utilities Commission of Ohio (PUCO) has approved safety upgrades at highway/rail grade crossings in Clinton, Fairfield and Jackson counties.
The Georgia Ports Authority (GPA) announced Jan. 17 that it handled a record 5.9 million TEUs in Calendar Year (CY) 2022, an increase of 5% over 2021.
Railway Track & Structures’ cover story for the November 2022 issue focused on the severe damage to the Seminole Gulf Railway in southwest Florida by Hurricane Ian. The storm not only impacted the railroad, but the service it provides to the community after a natural disaster occurs, especially moving building materials along its lines to support rebuilding efforts.