| LA Metro sets meetings on Green Line Extension Project |
|
|
|
| Thursday, October 07, 2010 | |
|
Los Angeles Metro will hold four community meetings beginning October 20 to update the public on the South Bay Metro Green Line Extension project. The purpose of these meetings is to seek public comments and input as the environmental process continues for extending rail service farther into the South Bay to improve mobility in southwest Los Angeles County. Metro is currently preparing a Draft Environmental Impact Statement/Environmental Impact Report (DEIS/DEIR) to identify transit improvements that would provide an alternative to the I-405 corridor by accessing the regional rail network through connections to the proposed Crenshaw/LAX Transit Corridor, currently under environmental review. As part of the Draft EIS/EIR, Metro will assess existing conditions in the study area, further refine the project alternatives, assess their potential impacts and identify possible and reasonable mitigation measures. Two ‘build' alternatives are being considered in the DEIS/DEIR. The Light Rail Alterative will evaluate extending the Metro Green Line from its current terminus at the Redondo Beach Station to the proposed Torrance Regional Transit Center (RTC). The freight track alternative will evaluate operating self-propelled rail transit vehicles on the Harbor Subdivision right-of-way using upgraded rail tracks from the El Segundo/LAX area to the proposed Torrance RTC. In addition the Draft EIS/EIR will evaluate the No Build and Transportation Systems Management alternatives. The public is encouraged to attend the community meetings and provide their input. Discussed at the meetings will be a project overview and update, a recap of the Scoping Meetings that took place earlier this year and a progress report on the project alternatives and proposed station locations.
The study area
encompasses approximately 30 square miles and includes the cities of El
Segundo, Hawthorne, Inglewood, Lawndale, Los Angeles, Manhattan Beach, Redondo
Beach and Torrance as well as the Del Aire and Lennox areas of unincorporated
LA County. The project is partially funded under Measure R, the half-cent sales tax approved by the voters in November 2008. Under Measure R, the project is provided $272 million in funding for the Metro Green Line Extension to the South Bay Corridor. This project is contained in the constrained element of the 2009 Long Range Transportation Plan (LRTP). |
Sign up for Rail Brief & Rail Group News
| Keep up with the latest rail news with our email newsletters |



