Metrolinx Tests Light Rail Vehicles on Finch West LRT

Written by Jennifer McLawhorn, Managing Editor
image description
Finch West LRT vehicle testing
Courtesy of Metrolinx

TORONTO – Finch West LRT vehicles have traversed the full alignment up to 60km/h for the first time.

Metrolinx announced the milestone brings it closer to the completion of the Finch West LRT. Currently, crews are assessing systems and their functions. These include examining “how the vehicle moves, how communications systems perform, doors opening and closing properly, overhead electrical connectivity, and power transfers, as well as seeing how the vehicles perform while accelerating and braking.”

While crews performed vehicle testing, there is other progress occurring on the project. Crews have completed work on the overhead catenary systems, and they have installed 116 pedestrian canopies. Additionally, 18 light rail vehicles were delivered to the site and are now housed at a maintenance and storage facility.

During this testing, Metrolinx has asked those travelling in the area to keep important safety information in mind. Specifically, do not enter the track area by foot, bike, or car as it is prohibited and to wait for passing light rail vehicles to clear the area before crossing.

Courtesy of Metrolinx via YouTube
Tags: , , , , ,

Media