Herzog

Caltrain OCS Fully Energized

From Our Colleagues at Railway Age:

SAN CARLOS, Calif. ––Caltrain, with partners Pacific Gas & Electric Company (PG&E) and Balfour Beatty, have energized and tested the OCS (overhead catenary system) on the entire 51-mile Caltrain Electrification Project between San Francisco and San Jose. The next step is testing the system’s Stadler Rail-built EMUs (electric multiple-units) at maximum operating speed and prepare for electrified revenue service, expected to commence in September 2024.

ASLRRA, Wabtec offer cloud PTC solution

The American Short Line and Regional Railroad Association (ASLRRA) has entered into an agreement with Wabtec Railway Electronics, Inc. to provide Positive Train Control (PTC) support to its members via the Wabtec Cloud