Railway Track and Structures
Subscribe
  • Login
Subscribe
  • NEWS
  • Freight
    • Class 1
      • BNSF’s Barstow International Gateway Project in California Approved by City Council
      • NTSB Sending Team to East Tennessee to Investigate Yesterday’s Norfolk Southern Derailment
      • Track Geometry & Rail Flaw Detection Registration is Open for Track Geometry & Rail Flaw Detection Virtual Conference
      • Please Spread the Word on Safety While Watching Union Pacific 4014 Big Boy
    • Shortline/Regional
      • C$1M Allocated for Short Line Rail Infrastructure in Saskatchewan
      • $1.8M Awarded for Five Kentucky Rail Infrastructure Projects
      • Track Geometry & Rail Flaw Detection Registration is Open for Track Geometry & Rail Flaw Detection Virtual Conference
      • Top Projects for 2026: Remarkable Feats of Railroad Engineering
    • Yards & Terminals
      • Top Projects for 2026: Remarkable Feats of Railroad Engineering
      • STV Delivers Industrial Water Infrastructure at Amtrak’s Ivy City Yard
      • UIPA Board Approves $500K for Rail Yard Relocation
      • NS Upgrades South Kickback Track at Lamberts Point
  • Passenger
    • Intercity
      • January 2026: Construction of the launch box at the tunnel portal in New Jersey. HTP Work Stoppage on the Way?
      • Choppy Air for Brightline
      • MassDOT To Reveal Conceptual Amtrak Station Design for Palmer
      • Skanska JV, VPRA Sign Contract to Build Long Bridge North in Washington, D.C.
    • Commuter/Regional
      • Virginia Railway Express Acquires Rail Yard Near Washington, D.C.
      • Newtonville Station Accessibility Improvements Project Taking Shape
      • California Transportation Foundation Names SMART Windsor Station Rail and Transit Project of the Year
      • MBTA Completes GLTPS Work on Green Line E Branch
    • Rapid Transit/Light Rail
      • OTG Selects Schneider Electric Canada for Ontario Line South
      • Top Projects for 2026: Remarkable Feats of Railroad Engineering
      • Sound Transit Board Adopts Updated ST3
      • RTD Begins Reconstruction June 7
  • Track Construction
    • Construction
      • NJ Transit, Amtrak Move Forward With Sawtooth Bridges Project
      • VTA Offers Initial Response to Management and Oversight Report of BSVII
      • CHSRA Advances Major Construction Procurement
      • CSX, Maryland Leaders Hold Ribbon-Cutting at Port of Baltimore
    • Ballast, Ties, Rail
      • Vossloh To Equip High-Speed Rail Line
      • January 2026: Construction of the launch box at the tunnel portal in New Jersey. HTP Work Stoppage on the Way?
      • ST&T’s 30-member team has an “unwavering commitment to safety,” according to owner CPKC, and has increased output from 460,000 ties in 2022 to more than 700,000 in 2024. ST&T Marks Safety Milestone
      • Historic N.C. Rail Line May Be Rebuilt After Helene
  • Track Maintenance
    • ON Track Maintenance
      • UTA Begins Summer Construction
      • MBTA Completes Green Line C Branch Work
      • Merrimac Bridge Project is Complete
      • CSX Shares Day in the Life of a Track Supervisor
    • OFF Track Maintenance
      • 50 St Station Accessibility Upgrades Funded Through ZFA Program
      • SEPTA Seeking RFI for Development at Germantown Station
      • MBTA Celebrates Foxboro Commuter Rail Station Upgrades
      • STV Delivers Industrial Water Infrastructure at Amtrak’s Ivy City Yard
  • Safety
  • Bridges/Tunnels
  • Grade Crossings
  • June 13, 2024
  • Bridges/Tunnels

Metrolinx Begins Work for New Train Bridge on Lakeshore West Line

TORONTO – Metrolinx will build a new train bridge on Burloak Drive on its Lakeshore West Line.

  • June 12, 2024
  • Class 1

Watch: Norfolk Southern Introduces ‘Thank A Railroader’ Locomotive Paint Scheme

ATLANTA –– Norfolk Southern yesterday released a new “Thoroughbred, Thank A Railroader” paint scheme for one locomotive, which is already in service.

  • June 12, 2024
  • Track Construction

Progress Update on OC Transpo’s East, West, and South Extensions

OTTAWA, Ontario – OC Transpo provided a progress update and planned infrastructure work on its O-Train East, West, and South extensions.

  • June 12, 2024
  • ON Track Maintenance

Amtrak’s Adirondack Service Closure Extended to September

ROUSES POINT, N.Y. – Amtrak’s Adirondack service closure has been extended to September to allow for track modifications.

  • June 11, 2024
  • Passenger

Caltrain Announces Start Date for Revenue Electric Service

SAN FRANCISCO –– Last week, we reported that Caltrain was in its final stages of testing it’s electric trains sets in anticipation of beginning revenue service this fall. They have now announced the date service will begin.

  • June 11, 2024
  • Bridges/Tunnels

NJ TRANSIT Awards Design and Engineering Services Contract for Brielle Drawbridge Replacement Project

NEWARK, N.J. – The NJ TRANSIT’s Board of Directors approved a contract to advance the Brielle Drawbridge Replacement Project.

  • June 11, 2024
  • Passenger

King George Station Reopened Following Maintenance Work

SURREY, British Columbia – King George Station reopened on June 9th after a six-week closure to allow for maintenance work and repairs.

  • June 11, 2024
  • News

FRA Publishes Three Technical Reports; RABIT, Ballast Stabilization, 3D Scanning Method for Crossties

WASHINGTON, D.C. – The Federal Railroad Administration (FRA) published three technical reports on RABIT system, ballast stabilization, and using a handheld scanner to scan the surface of crossties.

  • June 11, 2024
  • Rapid Transit/Light Rail

BART Regional Connector Project Begins Construction on Phase 2

SAN JOSE – Santa Clara VTA officials gathered to break ground on the Eastridge to BART Regional Connector Project on June 8th.

  • June 10, 2024
  • News

Michigan Central Station Reopens Amid Star-Studded Gala

DETROIT –– Michigan Central Station in Detroit officially reopened last week with a concert featuring performers from the entertainment industry and a review of iconic members of the Detroit community.

  • June 10, 2024
  • Freight

House Subcommittee Hearing to Address California Locomotive Emissions Rule

WASHINGTON, D.C. –– The Investigations & Oversight Subcommittee of the Committee on Science, Space, and Technology will hold a hearing this week on the California rule on locomotive emissions.

  • June 07, 2024
  • Track Construction

Harrisburg Line Track Renewal Project Moves to Phase 3

HARRISBURG, Pa. – Amtrak’s Harrisburg Line Track Renewal project will enter phase three on Monday, June 10th.

  • June 07, 2024
  • Freight

Joe Hinrichs –– You’re The Man!

ATLANTA –– FROM THE DOME ––From the June 2024 Issue of Railway Track & Structures.

  • June 07, 2024
  • News

Railway Track & Structures 2024 Top Projects

ATLANTA – Railway Track & Structures, June 2024 issue: Here are ten of the most impressive rail infrastructure projects across North America in 2024.

  • June 07, 2024
  • News

John Hong, PE, Joins HNTB as Construction Project Director

LOS ANGELES – HNTB Corporation announces John Hong, PE, has joined as construction project director in the Los Angeles office.

  • June 07, 2024
  • Regulatory

Maryland BPW Approves $100MM Contract to Advance Baltimore Red Line

BALTIMORE – Maryland Board of Public Works approved a Program Management Consultant service contract for the Maryland Transit Administration.

  • June 06, 2024
  • Track Maintenance

Four Amtrak Stations in California Receive Accessibility Upgrades

MARTINEZ, Calif. – At several Bay Area stations, Amtrak has completed accessibility upgrades, ensuring a better and more comfortable experience for customers.

  • June 06, 2024
  • Grade Crossings

A Smooth Ride –– Protecting Both The Vehicle And The Infrastructure 

ATLANTA –– From the June 2024 Issue of Railway Track & Structures –– A Vendor Product Spotlight on Grade Crossing Surfacing Materials.

  • June 06, 2024
  • Shortline/Regional

Watco Adds Verdigris Southern to It’s Portfolio of Railroads

PITTSBURG, Kan. –– Railroad holding company Watco, which operates 45 short line railroads, has added a new line to its portfolio –– the Verdigris Southern (VESO), the company’s 46th road.

  • June 06, 2024
  • Track Maintenance

WMATA To Perform Maintenance Work on Red and Green Lines

WASHINGTON, D.C. – Crews will perform maintenance and make repairs on WMATA’s Red and Green Lines from June 8-9.

Posts pagination

Previous page 1 … 77 78 79 … 877 Next page

Subscribe to our newsletter

Rail news and analysis from Railway Age, IRJ and RT&S by email.

Rail Resources

  • Digital Edition
  • Newsletters
  • Track Buyers Guide
  • Job Board
  • Conferences
  • Podcasts
  • Industry Events
  • EOI/RFP/RFQ Notices
  • RT&S Annual Awards
  • Books & Training
  • Webinars

Popular Articles

Sections

  • News
  • Freight
  • Passenger
  • Track Structure
  • Track Maintenance
  • Safety
  • Regulatory

About Us

  • About Us
  • Advertise
  • Contact Us
  • Website FAQ
  • Privacy Policy

Connect With Us

  • Subscribe
  • Newsletters
  • Magazine
  • Subscription Services
  • Facebook
  • Twitter
  • RSS

Resources

  • Railway Age
  • International Railway Journal
  • The Railway Educational Bureau
  • Simmons Boardman Books
  • Simmons-Boardman Publishing
  • Railway Age Conferences
Copyright © 2026 Simmons-Boardman Publishing Inc.
MENU
    • Login
  • NEWS
  • Freight
    • Class 1
    • Shortline/Regional
    • Yards & Terminals
  • Passenger
    • Intercity
    • Commuter/Regional
    • Rapid Transit/Light Rail
  • Track Construction
    • Construction
    • Ballast, Ties, Rail
  • Track Maintenance
    • ON Track Maintenance
    • OFF Track Maintenance
  • Safety
  • Bridges/Tunnels
  • Grade Crossings