Commuter/Regional

Metrolinx will install a new steel pipe culvert as part of the Toronto Lakeshore East Rail Corridor project.

Watch: Metrolinx’s Culvert Replacement Project

Crews will be replacing a collapsed culvert with a new steel pipe culvert in Small’s Creek, as part of Metrolinx’s Toronto Lakeshore East Rail Corridor project. The work will restore the creek’s water flow through the embankment, improve drainage and reduce the risk of flooding.

Amtrak Looks to Remove Pennsylvania ‘Distant Signals’

With Positive Train Control (PTC) operational, Amtrak is seeking Federal Railroad Administration (FRA) approval to remove automatic wayside signals serving as distant signals to existing interlockings on the Mid-Atlantic Division’s Philadelphia-to-Harrisburg, Pa.

MTA Announces Accessibility Upgrades at Multiple Subway and LIRR Stations

NEW YORK, N.Y. The Metropolitan Transportation Authority (MTA) announced a sweeping package of accessibility upgrades that will make nine more New York City Subway stations accessible, replace and upgrade elevators at another five subway stations, and make seven Long Island Rail Road stations in Queens and Nassau and Suffolk Counties fully accessible for the first time while replacing elevators at two additional LIRR stations.

Broadway Subway Project Update

VANCOUVER, BC – On October 12, RT&S reported on the introduction of tunnel boring machines to Vancouver’s Broadway Subway project, and said “The project will add 3.5 miles to the SkyTrain Millennium Line, from the VCC-Clark Station to Broadway, then Arbutus. Total funding for the project, about US$2.3 billion, will be shared by the government of British Columbia, the government of Canada, and the city of Vancouver.”

Cass Scenic Railroad Working with WVDOT to Replace Bridge

CHARLESTON, WV – The Cass Scenic Railroad has been a popular attraction for rail enthusiasts and the general public since it opened in 1963. A portion of the railroad, the line between Cass and Durbin, has not been used since 1985 when the Trout Run Bridge was washed away by a flood.

RTD Resumes Full Service on R Line

Following a derailment that occurred in Aurora on Sept. 21 that impacted the R Line, the Regional Transportation District (RTD) has restored full service to the affected four-mile stretch of the corridor from Aurora Metro Center to the 13th Avenue Station with additional safety measures in place.

STV/AECOM JV Starts GCL Design Work

South Jersey Transit Partners (SJTP) a joint venture of AECOM and STV Inc., has started work with the Glassboro-Camden Light (GCL) project team to design an 18-mile DLRT (diesel light rail transit) project that will restore passenger rail service between Glassboro and Camden, N.J. that has been absent since the 1950s.

VTA’s Single Bore Tunnel Gets Green Light From APTA Peer Review

In 2017, engineers from several firms performed a study for a proposed joint venture between the Valley Transportation Authority and the Bay Area Rapid Transit (BART) system to determine if a single-bore or dual-bore tunneling process would be best for a six-mile extension into San Jose and Santa Clara.