CTDOT Releases 2027-2030 STIP
NEWINGTON, Conn. – The Connecticut Department of Transportation (CTDOT) released the 2027-2030 draft Statewide Transportation Improvement Program (STIP).
NEWINGTON, Conn. – The Connecticut Department of Transportation (CTDOT) released the 2027-2030 draft Statewide Transportation Improvement Program (STIP).
NEWINGTON, Conn. – The Connecticut Department of Transportation (CTDOT) announced $20 million in infrastructure grants.
STRATFORD, Conn. – The Connecticut Department of Transportation’s (CTDOT) Office of Engineering is developing plans to replace the Devon Rail Bridge.
HARTFORD, Conn. – Across the state of Connecticut, CTDOT plans to remove and install markings and signs ahead of grade crossings.
STAMFORD, Conn. – The Connecticut Department of Transportation (CTDOT) released a Request for Proposals (RFP) for the Stewart B. McKinney Stamford Transportation Center (STC).
BETHEL, Conn. – The track and slope stabilization project has been proposed for the Bethel and Wilton sections of the Danbury Branch.
A second track between Hartford and Windsor on the CTrail Hartford Line has been completed and is open, according to the Connecticut Department of Transportation (CTDOT).