MBTA Completes Work on Green Line B, C, D Branches
BOSTON – The MBTA completes work on the Green Line B, C, and D branches.
BOSTON – The MBTA completes work on the Green Line B, C, and D branches.
WASHINGTON, D.C. – Construction on WMATA’s Green Line ended December 30, and its Yellow Line now extends to Greenbelt.
BOSTON – The MBTA will make service changes for December to allow for signal modernization on its Orange Line and replacement of overhead wire troughs on its Green Line.
ST. LOUIS – A MetroLink Green Line that would traverse north to south is cancelled for St. Louis.
BOSTON – The MBTA has announced its Green Line service between North Station and Union Square and between North Station and Medford/Tufts has resumed after a derailment on October 1st.
BOSTON – The MBTA announced service changes on several lines so it can continue its work in maintaining track infrastructure across its system.
WASHINGTON, D.C. – Crews will perform maintenance and make repairs on WMATA’s Red and Green Lines from June 8-9.
BOSTON – The MBTA announced it has completed track work on its Green Line, including replacing more than 1,300 ties and 10,800 feet of rail.
WASHINGTON, D.C. – WMATA announced closures of several Green Line stations to allow for crews to install fiber-optic cables.
WASHINGTON, D.C. – In a news release from Washington Metropolitan Area Transit Authority (WMATA), two Orange Line stations re-opened today after track maintenance.
BOSTON – MBTA will host an open house this week regarding a 12-day closure of its B Branch to allow for track work in July.
WASHINGTON – Washington Metropolitan Area Transit Authority will reopen two stations on its Orange and Silver Lines while its Orange Line enters a second phase of construction.
BOSTON – Service on part of MBTA’s Green Line resumed after a derailment.
The MBTA has announced that Green Line E Branch service resumed earlier than previously scheduled following the successful completion of track and Green Line Train Protection System (GLTPS) work during a 16-day closure along the line.
The Massachusetts Bay Transportation Authority (MBTA) announced that from Monday, Aug. 2, through Sunday, Aug. 29, crews will work around the clock to replace outdated track including ties, ballast, and rail as well as pavement on the Green Line E Branch between South Huntington Avenue and Brigham Circle Station.
The Massachusetts Bay Transportation Authority (MBTA) has awarded Advanced Rail Management, Corp., (ARM) a four-year contract with two option years for optical rail measurement services.
L.A. Metro has now entered the final planning phase for a $1 billion light rail line extension from Redondo Beach to Torrance.
Saving some green is the current mindset of Calgary officials when it comes to the construction of the new Green Line. Future expansion also is top of mind as the City Council
By the start of summer the city of Calgary will know if it has warmed up enough to plans for a new Green Line light rail track. The Calgary City Council is
Overall transit riders took fewer trips on Metro Transit in 2019, but there is plenty of blame to go around.