Watch: Crews remove second span of Merchants Bridge
Written by RT&S StaffCrews have been working to remove the second truss of the Merchants Bridge in St. Louis.
Walsh Construction and Mammoet have been working together to remove the 520-ft-long span of the rail bridge. This is the second of three spans that are being replaced over the Mississippi River.
Read more articles on rail bridges.